Coastal Zone Act Application Status
   
View: 
Use SHIFT+ENTER to open the menu (new window).
Address
Project Summary
collapse Active Application : Yes ‎(2)
Attachment
Cherry Island Renewable Energy LLC
301 Jackson Street
ColumbusIndiana 47201
A 12” HDPE pipeline to convey landfill gas (LFG) is proposed from the Delaware Solid Waste Authority’s (DSWA) Cherry Island Landfill in Wilmington, DE to various industrial end users.
Attachment
Croda Inc.
315 Cherry Lane
New Castle DE 19720
A combined heat and electric power (CHP) project using landfill gas delivered to the site from the nearby Cherry Island Landfill.  Features two 1.1 MW lean-burn gas generator sets, a waste heat recovery system, and an absorption chiller. 
collapse Active Application : No ‎(13)
Attachment
Diamond State Generation Partners (Bloomenergy)
1299 Orleans Drive
SunnyvaleCalifornia 94089
The Red Lion Fuel Cell Installation will provide up to 47 MW of electrical power that will be connected to the PJM electrical grid. The project will consist of 235
Bloomenergy ES-5700 Energy Server fuel cells that will utilize pipeline quality natural gas. The project will be built in phases, the first phase consisting of 27 MW of capacity, and the second phase an additional 20 MW.
Attachment
MWL Products Inc.
26050 Orchard Lake Road, Suite 300
Farmington Hills Michigan 48334
Proposal to manufacture boiler fuels on the 5-acre property adjacent to the existing pier at DuPont Chambers Works. The operations will utilize the existing two storage tanks at the facility and the pier will be prepared and used for the single purpose of receiving base stock for the manufacturing operation.
Attachment
Calpine Corporation
500 Delaware Ave., Suite 600
Wilmington DE19801
Status decision for a new small auxiliary package boiler (500 hp) to be installed and operated at the company's Edge Moor Energy Center.  Purpose is to provide steam for heating the Energy Center's residual oil tank, piping systems and building.
Attachment
Du Pont Titanium Technologies (Edge Moor)
104 Hay Road
Edge Moor DE19809
The plant is proposing to install two natural gas-fired packaged boilers (48.16 MMBTU/hr each). The steam generated from the boilers will be used for process and comfort heating. The raw material used to generate steam will be purchased water.
Attachment
Terra Systems Inc.
1035 Philadelphia Pike, Suite E
Wilmington Delaware 19809
Terra Systems, Inc. is considering leasing 5,000 square feet of office and warehouse space. The 94,767 square foot facility situated on 13.5065± acres of land is currently used as an office and warehouse. The Terra Systems, Inc. leased space will be used for the following three activities:
Activity #1: Office Space -- approximately 1,000 square feet
Activity #2: Research & Development, Treatability Testing, Product Quality; testing laboratory will be approximately 1,400 square feet. We currently operate our laboratory at 1035 Philadelphia Pike Suite E, Wilmington DE under EPA Permit
DER000002360
Activity #3: Fluid Blending – approximately 2,600 square feet
Attachment
Oceanport LLC
6200 Philadelphia Pike
ClaymontDE19703
The project would bring in potash (Muriate of Potash) from vessels by clam bucket with sealed lip. The product is in dry, small pellet form and will be stored in an existing storage tank modified to safely hold the product. No dust is expected to be present in the off loading and transport to the storage vessel. Initial delivery of the product is anticipated at approximately 7,000 tons. the product is used as a fertilizer.
Attachment
Hydrocarbon Recovery Services Inc. dba FCC Environmental
523 North Sam Houston Parkway East, Suite 400
Houston Texas 77060
Construction and operation of a used oil recycling facility
Attachment
Tidewater Environmental Services Inc.
1100 South Little Creek Road
Dover Delaware 19901
The Wandendale Regional Wastewater and Disposal Facility is proposed to have a capacity to three 3 million gallons per day of domestic wastewater using membrane bio-reactor treatment technology with rapid infiltration basins (RIBs) and spray irrigation.
Attachment
Mountaire Farms of Delaware Inc.
29005 John J. Williams Highway
Millsboro DE 19966
Construct and operate a resource recovery facility which would recover unused protein (blood, feathers and offal) and process it into hydrolyzed feather and poultry meal and feed grade fat.
Attachment
Bouchard Affiliates
58 South Service Road, Suite 150
Melville NY11747
Transfer (lighter) oil from doulbe-hulled tankers to flat-deck double-hulled barges.
Attachment
MAGCO Incorporated
341 Pigeon Point Road
New Castle Delaware 19720
Proposed sea salt packaging facility
Attachment
TA Instruments
109 Lukens Drive
New CastleDE19720
To manufacture 125 rheological and 600 thermal instruments per year
Attachment
Premcor Refining Group
4550 Wrangle Hill Road
Delaware CityDE19706
Installation of new pollution control equipment for the removal of NOx from FCCU gas scrubber stack